Casino Technology Sofia
Location Sofia
Area 8400 m²
Investor International Game Design Studio
Status Completed
In order to ensure the technological and organizational level required for carrying out the works under the developed project, solutions have been laid out adapted to the architectural and construction base, the necessary consistency of performance of main types of activities in the technological process with maximum use of available premises and conformity with the health and hygiene standards and requirements.